Export is the starting artifact. Migration is complete when users authenticate against identity you operate, data lives in a store you can restore, and DNS answers from accounts you admin — with a rehearsal that already failed safely.

30 min · senior team · leave with a clear next step

Citation-ready answer

Answer you can cite

Migrating from Lovable is a cutover of code, data, identity, and traffic onto infrastructure you can inventory. The export is the starting artifact. The migration is complete when auth tokens, environment variables, and DNS answer from your accounts, a rehearsal has restored data into a throwaway environment, and rollback is a prior artifact — not a hope that the old project still runs.

Why migrations stall

Traffic moves faster than identity and data

Pointing a domain at a new host is the visible step. Sessions, webhooks, and foreign keys are the ones that wake you up.

  • Users are still bound to preview auth

    If session cookies or magic links only work on the builder host, a DNS flip logs everyone out — or worse, splits identity.

  • Dual-write lasts forever unless you schedule the end

    Temporary sync is fine. An unowned sync job is a second production. Write the date it dies before you start it.

  • Webhooks still hit the old URL

    Payments, email, and storage callbacks will keep writing to the builder until every vendor is repointed and tested.

  • Rollback was “we still have Lovable”

    That is hope. Rollback is the previous artifact and a data reverse or forward-fix you have already timed.

The cutover sequence

Inventory, reproduce, rehearse, then flip DNS

We will not flip a domain to prove velocity. We flip it after a failed rehearsal has already taught us the reverse.

01

Inventory code, data, identity, and vendors

Tables, files, cron, auth providers, and every callback URL. If it is not on the list, it is not in the migration.

02

Reproduce on empty infrastructure you admin

New project, new secrets, production-like config, no production data yet. Prove the app boots from a clean checkout.

03

Restore into a throwaway environment

Take a copy, load it, and complete the paid or invite journey. Compare counts. That rehearsal is the migration’s first artifact.

04

Cut identity, then data, then DNS

Sessions and webhooks before public traffic. DNS last. Keep a freeze window and a named rollback artifact.

How to

Migrate a Lovable app onto infrastructure you operate

A cutover of code, data, identity, and traffic. Success is a rehearsal plus a rollback artifact, not a DNS change alone.

  1. Step 01

    Inventory every dependency

    List tables, file buckets, cron, auth, email, payments, and webhook URLs. Assign an owner to each. Missing items do not migrate; they break later.

  2. Step 02

    Reproduce the app on empty infrastructure

    New host, new secrets, clean checkout. Confirm the build and a smoke login before any production data is copied.

  3. Step 03

    Rehearse a restore into a throwaway environment

    Load a copy of the data, run the core journey, and compare record counts. Time the restore. That timing is part of the rollback plan.

  4. Step 04

    Cut identity and vendor callbacks before DNS

    Move auth and webhooks so sessions and payments do not split across hosts. Dual-write only with a written end date.

  5. Step 05

    Flip DNS with a named prior artifact

    Freeze risky writes, switch traffic, watch the core journey, and keep the previous artifact ready. Hope that Lovable still runs is not rollback.

Before you book

Practical answers

Prefer writing? Send project details and we reply within one business day.

What is in a Lovable migration besides a git export?

Data, identity, webhooks, scheduled jobs, file storage, and DNS — each with an owner. The export is the code starting point. The migration is complete when those dependencies answer from accounts you can restore and roll back.

How do you cut over auth and data without dual-writing forever?

Reproduce on empty infrastructure, rehearse a restore, then move identity and callbacks before DNS. If you dual-write, write the end date before the job starts. An unowned sync is a second production system.

When should DNS move relative to the database?

After identity and vendor callbacks work on the new host, and after a restore rehearsal has already succeeded. DNS is the public step. Data and sessions are the load-bearing ones.

What is a failed migration rehearsal allowed to prove?

That rollback is a prior artifact and a timed restore or forward-fix — not a belief that the old Lovable project will still boot. A rehearsal that cannot fail safely is not a rehearsal.

Cut over with a rehearsal, not a domain flip.

Bring the tables, the auth provider, and the webhook list. We will put DNS last — and name the artifact you roll back to.