Skip to main content

Shared checklist · Ship gates

Ship Checklist — Release Gates, Store Submission & Rollback for Vibe MVPs

A vibe MVP is not shipped when the preview URL looks finished. Treat ship as a go/no-go ritual: freeze the cut, prove provenance, clear store or domain gates, smoke the critical path, and name who can reverse the release before the first stranger lands.

30 min · senior team · leave with a clear next step

Citation-ready answer

Answer you can cite

CodeCross LLC’s ship checklist for vibe-coded products is the release, store, and rollback gate that turns a working demo into a cut you can put on a real domain—or App Store / Play—without guessing. We cover freeze criteria, build provenance, listing and privacy readiness, smoke paths, and a documented rollback so Lovable, Bolt, Rork, or v0 MVPs do not “ship” as irreversible deploys. Intent is ship gates, not a full platform exit.

What ship actually means

A finished-looking preview is not a release

Prompt loops optimize for a path that works in a friendly environment. Shipping is a ritual with owners: freeze, provenance, listing truth, smoke, and a reverse you can execute without the person who prompted the feature.

  • Polish is not freeze criteria

    If scope is still moving, you are demoing. Write what is in the cut, what is explicitly out, and who can add a last-minute change.

  • A URL is not build provenance

    Name the tagged artifact, the commit, and the environment it was built for. A generator preview that cannot be rebuilt is not a release candidate.

  • Listings are data-collection claims

    Privacy copy, nutrition labels, and account-deletion paths have to match what the binary actually collects. Store review fails the launch window when that story is invented later.

  • Traffic without a reverse is a one-way door

    Keep the prior artifact warm. Document DNS, flag, or store-halt steps. Freeze irreversible deletes until soak time passes.

The ritual

Four gates between demo and strangers

Adjust the order for web versus store. Do not skip a gate because the screenshot looks done. The deliverable is a cut you can reverse.

01

Freeze the cut and the seats

Name product, release, and rollback owners. Stop unreviewed feature expansion while the candidate is proven.

02

Tag the artifact and prove env parity

Preview is not production. Confirm secrets, feature flags, and integrations match the shape you will serve — minus production credentials.

03

Clear listing, privacy, and store seats

Domain or App Store / Play ownership, privacy text that matches collection, and a binary that can survive review — not a web preview link pasted into a store form.

04

Smoke the path and keep rollback warm

Sign-in, the primary write, the paid or invite path, and the integration you cannot fake. Then walk the reverse once, on the clock.

How to

Run a ship checklist before a vibe MVP goes public

A pass/fail release ritual. The output is a tagged cut with a named rollback owner — not a polish punch list.

  1. Step 01

    Freeze scope and name the cut

    Write what is in this release, what is explicitly out, and who may add a last-minute change. Stop prompt-loop feature expansion while the candidate is under review.

  2. Step 02

    Tag a reproducible build and prove env parity

    Produce a tagged artifact from a known commit. Confirm preview is not production: secrets, flags, and integrations share shape, not production credentials.

  3. Step 03

    Clear listing, privacy, and store seats

    Own the domain or the App Store / Play accounts. Make privacy and listing copy match real collection. For Rork or hybrid products, treat submission and rejection remediation as part of this ritual.

  4. Step 04

    Smoke the critical path

    Exercise sign-in, authorization, the primary write, and the integration you cannot stub. Record what failed instead of assuming the preview covered it.

  5. Step 05

    Write the rollback and name the owner

    Keep the prior artifact warm. Document DNS, feature-flag, or store-halt revert steps. Freeze irreversible deletes until soak time passes. Do not call the cut shipped until someone else can follow the reverse.

Before you book

Practical answers

Prefer writing? Send project details and we reply within one business day.

What belongs on a ship checklist before a vibe MVP goes public?

Freeze scope, a tagged reproducible build, env parity so preview is not production, a critical-path smoke, privacy and listing copy that matches real data collection, and a named rollback owner. CodeCross LLC treats those as pass/fail gates—not a polish punch list—so launches do not invent process after users arrive.

How do App Store and Play fit a vibe-coding ship checklist?

Store releases need account ownership, privacy nutrition labels, account-deletion paths where required, and a binary that survives review—not a web preview link. For Rork or hybrid products, CodeCross LLC folds submission and rejection remediation into the same ship ritual so review loops do not burn the launch window.

What is a minimum rollback story for a vibe-coded release?

Keep the prior artifact warm, document DNS or feature-flag revert steps, and freeze irreversible deletes until soak time passes. CodeCross LLC will not call a vibe MVP shipped until rollback is written down—especially after Bolt preview exits or a first v0/Next production promote.

How is a ship checklist different from MVP hardening?

Hardening reduces launch-blocking risk (auth, secrets, rate limits, recovery). The ship checklist is the final go/no-go for release, stores, and rollback. We often harden first, then run this ritual; when the prior step was tool-specific, open /vibe-coding/bolt-mvp-hardening or /vibe-coding/lovable-mvp-hardening.

Do not invite strangers until the reverse is written.

Bring the candidate cut and the store or domain story. We will name the gate that is still a guess — or tell you the ritual is already enough.

Prefer writing? Send project details on the contact page.